Industry & Energy Techical Projects | 210 6619 590 | info@bienter.gr

manesaikos f Short Description
OWNER: SHPP PELOPONISSOU S.A.
PROJECT: CONSTRUCTION OF 1.95MWe SMALL HYDROELECTRIC POWER PLANT
LOCATION: PETSAKOI DROSATO, ACHAIA PREFECTURE, GREECE

  Description:   Services:
Small HydroElectric Power Plant – 1.95MWe
- Plant production start: pending
  • Feasibility – Financial Studies
  • Design – Licensing
  • Selection and procurement of electrical production electromechanical equipment
  • Project Management
   Scope of work:    Technical Data:
  • TURN KEY construction
  • Intake: Civil works, equipment procurement/construction of electromechanical installations
  • Penstock: Complete installation of GRP penstock, manufacturing of special parts
  • Power House: Civil works, installation of electrical production equipment, manufacturing of penstock special parts and parts of electromechanical equipment
  • Two (2) vertical axis Pelton turbines, with five (5) noozles, manufactured by Geppert (Austria), 1080kW output each
  • Two (2) synchronous generators, 600V, 50Hz, 3-phase, 1200kVA output each
  • Steel Penstock, length 2650m, diameter: DN1100
BIENTER S.A. shareholders’ project